Feasibility of developing binary power plants in the existing geothermal production areas in Indonesia

Skoða venjulega færslu

dc.contributor Jarðhitaskóli Háskóla Sameinuðu þjóðanna is
dc.contributor.author Nazif, Havidh is
dc.date.accessioned 2020-07-02T16:24:49Z
dc.date.available 2020-07-02T16:24:49Z
dc.date.issued 2011
dc.identifier.issn 1670-7427
dc.identifier.uri http://hdl.handle.net/10802/23918
dc.description Í: Geothermal training in Iceland 2011, bls. 709-735 is
dc.description Myndefni: teikningar, gröf, töflur. is
dc.description.abstract In Indonesia, the target is for geothermal power plants to supply up to 12 GWe by 2025. Generally, single flash technology is the first step of development, but this study focuses on the utilization of waste heat from existing geothermal power plants to generate electricity at lower temperatures. Binary cycle technology is considered with four different proposed designs to maximize the output. The risk of silica scaling is one of the design constraints under typical conditions in geothermal fields in Indonesia; reservoir temperature, enthalpy of wells and brine pressure are employed in optimization calculations. A binary unit that combines brine and condensate before reinjection will produce the highest power production, 46 kW per 1 kg/s of brine for certain conditions. By simulating 2 MWe of development for each design at a reservoir temperature of 250°C, well enthalpy of 1200 kJ/kg and brine pressure of 10 bar absolute, it was found that the cost would be about 4.56-5.55 M USD, and would require an electricity price of 6.39-7.62 USC/kWh to achieve 16% IRR. is
dc.format.extent 1 rafrænt gagn (27 bls.) is
dc.language.iso en
dc.publisher United Nations University is
dc.publisher Orkustofnun is
dc.relation.ispartofseries United Nations University., UNU Geothermal Training Programme, Iceland. Report ; 2011 : 29
dc.relation.uri http://www.os.is/gogn/unu-gtp-report/UNU-GTP-2011-29.pdf
dc.subject Jarðhiti is
dc.subject Jarðhitanýting is
dc.subject Jarðhitavirkjanir is
dc.subject Indónesía is
dc.title Feasibility of developing binary power plants in the existing geothermal production areas in Indonesia en
dc.title.alternative Geothermal training in Iceland en
dc.type Bók is
dc.identifier.gegnir 991010684969706886


Skrár

Skrá Stærð Skráartegund Skoða Lýsing
UNU-GTP-2011-29.pdf 2.135Mb PDF Skoða/Opna Heildartexti