#

Planning an overhaul of the existing, non-operating Kapisya geothermal binary power plant (using perchloro-ethylene) after a prolonged dormancy period

Skoða venjulega færslu

dc.contributor Jarðhitaskóli Háskóla Sameinuðu þjóðanna is
dc.contributor.author Kombe, Clint is
dc.date.accessioned 2020-06-26T17:56:07Z
dc.date.available 2020-06-26T17:56:07Z
dc.date.issued 2010
dc.identifier.issn 1670-7427
dc.identifier.uri http://hdl.handle.net/10802/23717
dc.description Í : Geothermal training in Iceland 2009, bls. 223-254 is
dc.description Myndefni: myndir, teikningar, töflur. is
dc.description.abstract In Zambia, a small pilot geothermal Turboden binary power generating plant was constructed, but has remained non-operational for an extended period of time. The plant has been earmarked for reconditioning with a view to improving brine resources and up-rating the electro-mechanical equipment’s capacity. With resource evaluations in progress and the plant’s surface facility conditions assessed, the plant is set to be operational after equipment overhaul. This study examines the actual and potential overhaul requirements considering both non-operating and operating plant system states in a geothermal environment. The evaluation indicates that a condition-based equipment overhaul can be undertaken, incorporating potential equipment improvements in the system for enhanced performance. Baseline operating reliability maintenance strategy has been proposed by considering the Svartsengi Ormat binary plant standards in Iceland, operating experience and original equipment manufacturers’ recommendations. Making geothermal electrical energy as a preferred green energy source calls for an increase in exploration, drilling and plant construction expenses coupled with an effective reliability of plant maintenance and management. is
dc.format.extent 1 rafrænt gagn (32 bls.) is
dc.language.iso en
dc.publisher United Nations University is
dc.publisher Orkustofnun is
dc.relation.ispartofseries United Nations University., UNU Geothermal Training Programme, Iceland. Report ; 2009 : 14
dc.relation.uri http://www.os.is/gogn/unu-gtp-report/UNU-GTP-2009-14.pdf
dc.subject Jarðhitavirkjanir is
dc.subject Sambía is
dc.title Planning an overhaul of the existing, non-operating Kapisya geothermal binary power plant (using perchloro-ethylene) after a prolonged dormancy period en
dc.title.alternative Geothermal training in Iceland en
dc.type Bók is
dc.identifier.gegnir 991010551779706886


Skrár

Skrá Stærð Skráartegund Skoða Lýsing
UNU-GTP-2009-14.pdf 695.3Kb PDF Skoða/Opna Heildartexti

Þetta verk birtist í eftirfarandi flokki:

Skoða venjulega færslu

Leita


Fletta