Study of geothermal power plant electricial and control system with emphasis on reliability aspects

Skoða fulla færslu

Titill: Study of geothermal power plant electricial and control system with emphasis on reliability aspectsStudy of geothermal power plant electricial and control system with emphasis on reliability aspects
Höfundur: Kebede, Haile ; Jarðhitaskóli Háskóla Sameinuðu þjóðanna
URI: http://hdl.handle.net/10802/23491
Útgefandi: United Nations University; Orkustofnun
Útgáfa: 2002
Ritröð: United Nations University., UNU Geothermal Training Programme, Iceland. Report ; 2002-7
Efnisorð: Jarðhiti; Jarðhitarannsóknir; Jarðhitaverkfræði; Vatnsveitur; Virkjanir; Rafmagn
ISSN: 1670-7427
Tungumál: Enska
Tengd vefsíðuslóð: http://www.os.is/gogn/unu-gtp-report/UNU-GTP-2002-07.pdf
Tegund: Bók
Gegnir ID: 991010427909706886
Athugasemdir: Myndefni: kort, línurit, töflur.
Útdráttur: The main aim when constructing and installing electrical and control systems for a power plant is to have continuous and trouble free operation of the plant. Geothermal power plants are very different from hydro power plants. It is difficult to restart a geothermal power plant after shutdown and it is exposed to H2S corrosion. This report emphasizes plants using the binary process. The electrical system of a geothermal power plant is described, including generator, power transformer, different alternatives for switchgear configuration, protective relaying, auxiliary power supply and instrumentation. The control system configuration is described along with its effect on reliability. Operation and maintenance aspects are discussed, and both the reliability and H2S corrosion prevention aspects are discussed. Finally, the electrical and control systems in the Aluto-Langano geothermal pilot power plant are included as an example.