Comparison of drilling in geothermal fields in Krafla, Icaland and Tendhao, Ethiopia

Skoða fulla færslu

Titill: Comparison of drilling in geothermal fields in Krafla, Icaland and Tendhao, EthiopiaComparison of drilling in geothermal fields in Krafla, Icaland and Tendhao, Ethiopia
Höfundur: Muluneh, Abraham ; Jarðhitaskóli Háskóla Sameinuðu þjóðanna
URI: http://hdl.handle.net/10802/23412
Útgefandi: United Nations University; Orkustofnun
Útgáfa: 1999
Ritröð: United Nations University., UNU Geothermal Training Programme, Iceland. Report ; 1999:9
Efnisorð: Jarðhiti; Jarðhitarannsóknir; Jarðboranir; Jarðhitasvæði; Krafla; Eþíópía
ISSN: 1670-7427
Tungumál: Enska
Tengd vefsíðuslóð: http://www.os.is/gogn/unu-gtp-report/UNU-GTP-1999-09.pdf
Tegund: Bók
Gegnir ID: 991010425819706886
Athugasemdir: Myndefni: kort, línurit, töflur.
Útdráttur: This report compares the drilling of geothermal wells in Iceland and Ethiopia, describing the technology applied and practical activities. For this study, well KJ-32 in the Krafla geothermal field in Iceland (drilled 1998) and well TD-5 in the Tendaho geothermal field in Ethiopia (drilled 1997) were selected. In Krafla 35 wells have been drilled to date and of these 9 wells are directional, as is the case for well KJ-32. The well was drilled from the kick of point (KOP) to final depth with a steerable down hole motor and measurement while drilling (MWD). The target was to produce from the lower reservoir with a temperature of up to 320_C and to reach inaccessible parts of the reservoir below 1100 m. In Tendaho, six wells have been drilled, three deep wells and three shallow wells. Well TD-5 was drilled vertical to a depth of 516 m to intersect a shallow reservoir with a temperature of 240_C. The basic rig parts such as the mast, pumps, and cementing units are quite similar in the two countries and the casing program also. The drill strings make-up and use of logging tools, cementing material and manpower is, however, different. The opportunity was given to me to witness cementing operations at Nesjavellir and at Krafla. This included a three week period on site at Krafla during completion of well KJ-33 and the beginning of drilling well KJ-34.