Dieng geothermal project : Risk assessment for a decision on 60 MW expansion

Skoða venjulega færslu

dc.contributor Jarðhitaskóli Háskóla Sameinuðu þjóðanna is
dc.contributor.author Sondakh, Gloria Gladis is
dc.date.accessioned 2019-11-09T13:05:00Z
dc.date.available 2019-11-09T13:05:00Z
dc.date.issued 2019
dc.identifier.issn 1670-7427
dc.identifier.uri http://hdl.handle.net/10802/18959
dc.description Birtist í : Geothermal Training in Iceland 2018, bls. 497-525 is
dc.description.abstract Dieng is one of the prospected geothermal fields in Indonesia with an estimated field development potential of 350 MWe. Presently, one 60 MWe power plant unit has been installed and the current production is around 46 MW. Dieng geothermal power plant is owned and operated by PT Geo Dipa Energi (GeoDipa), a state-owned company. GeoDipa is implementing a phase development for the field. Unit 1 has been in operation since 1998 and now GeoDipa plans to add another 60 MWe unit. The Unit 2 project is still in feasibility stage and the feasibility study is currently being updated. In the development of Unit 2, there are risks that need to be considered before a decision can be made. Therefore, in this report, the risks associated with Unit 2 project are identified and appropriate mitigation actions are listed. The key risks have been identified to be resources and technical risks which are related to scaling and corrosion in production wells, turbines and the Fluid Collection and Reinjection System (FCRS). To mitigate scaling, methods such as hot water reinjection, pH modification, inhibitors, cold water injection and retention tank have to be studied further. Several environmental risks are also analysed and should be mitigated prior to a decision on the Unit 2 project. is
dc.format.extent 1 rafrænt gagn. is
dc.language.iso en
dc.publisher United Nations University is
dc.publisher Orkustofnun is
dc.relation.ispartofseries United Nations University., UNU Geothermal Training Programme, Iceland. Report ; 2018 : 26
dc.relation.uri https://orkustofnun.is/gogn/unu-gtp-report/UNU-GTP-2018-26.pdf
dc.subject Jarðhiti is
dc.subject Jarðhitanýting is
dc.subject Indónesía is
dc.title Dieng geothermal project : Risk assessment for a decision on 60 MW expansion en
dc.title.alternative Geothermal training in Iceland en
dc.type Bók is
dc.identifier.gegnir 991011447169706886


Skrár

Skrá Stærð Skráartegund Skoða Lýsing
UNU-GTP-2018-26.pdf 5.324Mb PDF Skoða/Opna Heildartexti

Þetta verk birtist í eftirfarandi flokki:

Skoða venjulega færslu

Leita


Fletta